Fifty alderpeople, fifty slices of the city. Search by name or neighborhood, shade the map by what you care about, and open any ward for its full dashboard — or look up your address to find yours.
Live from the Chicago Data Portal (crimes, 311, building permits, business licenses, traffic crashes, ward offices), refreshed hourly. Ranks compare all 50 wards; 1st is the highest value, which isn’t always the worst. Crashes, Divvy docks and affordable units are assigned to wards by their coordinates. Last-month bars are hatched because the month isn’t over.
Ward 8 — Michelle A. Harris · dashboard · chicago.fyi
$52MNov 26, 20251650 E 95th StNew Constructionspr 2019 cbrc: construct new 1 story addition to an existing 1 story warehouse building per plans (use group f-1 construction type iib).
$7.8MJan 20, 20261850 E 95th StNew Constructionspr 2019 cbc: new construction of a new 1 story warehouse building with associated site work including parking and fencing ( occupancy f-1 construction type iib).**certified corrections subject to field inspections & audit **
$6.1MApr 21, 2026810 E 103rd StRenovation/Alterationspr 2019 cbrc: cps gately park stadium renovation to include replacement of the turf surface, partial asphalt and concrete pavement replacement, new 10ft ornamental fence, 15ft & 25ft tall safety netting, new double gates, foundations for safety netting, goal post, flagpole, fence & gates. proposed electrical work to include new handholes, replacement of lighting fixtures on the existign sport lighting poles. exterior work only, no change in existing occupancy (u for existing bleachers) and construction type (ii-b for existing bleachers).
Crimes by month, 25 months
537Sep 2026· ▼ 2% vs Sep 2025· average ward 393
694
Oct 2024Ward 8Average wardOct 2026
Most reported, 2026 · vs 2025
Battery1,06322%±0%
Theft83618%±0%
Criminal Damage61313%▼ 15%
Assault60613%▲ 1%
Motor Vehicle Theft48010%▼ 5%
Other Offense4379%▲ 2%
Burglary2666%▲ 3%
When incidents happen · last 12 months
Busiest: Mon 12a–1a · 88 incidents · 1.3% of the year
$4.9MJun 17, 20262100 E 87th StRenovation/Alterationcps school - no change in use. interior renovations at chicago vocational career academy (cvca), current use/occupancy school e-1, proposed use/occupancy school e-1, includes pool deck floor, drain and piping replacement, girls/boys locker room renovations, mechanical, lighting, and pool equipment replacement, and other misc. trades. structural work includes pool basin repair, exterior stair and landing, new door lintel. site work includes sewer repair and pavement restoration.
$3MApr 13, 2026801 E 95th StNew Constructionnew accessory surface parking lot with 120 spaces, of 24 which are evse-ready. work to include new asphalt, landscape and site electrical. parking lot to serve chicago state university and metra rail commuters.
$2MJun 17, 20261710 E 93rd StRenovation/Alterationspr 2019 cbc: exterior landscape and flatwork renovation at an existing 1-story chicago public school (e-1) outdoor field location (construction type iia) as per plans.
$1.9MMar 3, 20268505 S Ingleside AveRenovation/Alterationself-cert 2019 cbrc: cps school, no change in use. re-roofing of an existing 3 story cps elementary school with select exterior masonry repair. miscellaneous interior repair resulting from roof work. (occupancy group e-1; type iia construction)
$1.2MJun 15, 20267740 S Ingleside AveRenovation/Alterationinterior renovation for 3 classrooms and locker rooms.