Fifty alderpeople, fifty slices of the city. Search by name or neighborhood, shade the map by what you care about, and open any ward for its full dashboard — or look up your address to find yours.
Live from the Chicago Data Portal (crimes, 311, building permits, business licenses, traffic crashes, ward offices), refreshed hourly. Ranks compare all 50 wards; 1st is the highest value, which isn’t always the worst. Crashes, Divvy docks and affordable units are assigned to wards by their coordinates. Last-month bars are hatched because the month isn’t over.
Ward 34 — William Conway · dashboard · chicago.fyi
$151.1MSep 16, 2026400 S La Salle StRenovation/Alterationphase 3 of 3: interior alterations to existing 7-story office building to convert to a data center. work to include new equipment with associated mep upgrades. phase 1 demolition only work permitted under 101083036. phase 2 infrastructure work permitted under 101081181. ia construction; b-business. consultant reviewer: v3 companies of il
$51.1MJul 6, 2026400 S La Salle StRenovation/Alterationdds 2019 cbrc: phase 2 of 3: infrastructure upgrades. convert 7 story office building to a data center. reinforcement of existing floors. architectural plans provided for reference. electrical work limited to electrical distribution from comed vault to upper floors. mechanical, plumbing and fire protection work to be permitted under phase 3. equipment to be permitted under phase 3. phase 1 demolition only work permitted under 101083036. ia construction; b-business consultant reviewer: v3 companies of il
$50MJun 22, 202619 S La Salle St
Crimes by month, 25 months
554Sep 2026· ▼ 10% vs Sep 2025· average ward 393
645
Oct 2024Ward 34Average wardOct 2026
Most reported, 2026 · vs 2025
Theft2,08343%▼ 7%
Battery55011%±0%
Criminal Damage47010%▲ 14%
Deceptive Practice3868%▼ 14%
Motor Vehicle Theft3397%▲ 26%
Burglary3297%▲ 116%
Assault2826%▼ 6%
When incidents happen · last 12 months
Busiest: Fri 2p–3p · 82 incidents · 1.3% of the year
dds 2019 cbrc: interior and exterior alterations to existing 17 story office building to convert it to a mixed-use building with ground floor retail use, hotel use on 2nd-3rd fls. with 32 rooms total, & a multi-unit residential use on 4th-16th fls. with 175 du's total to include partial 16 fl. rooftop deck for common use. addition scope is limited to stair and elevator penthouse at northeast corner of the 16th fl. work to include new partitions, structural, mechanical, electrical and plumbing as per plans. proposed occupancy groups include r1-hotel, r2-residential,& m-retail. type 1a construction and fully-sprinklered. consultant reviewer: v3 companies of il
$44MMar 25, 2026566 W Van Buren StNew Constructiondds / 2019 cbc: new construction of a 12-story residential building (199 units) w/ no basement to include ground parking (42 auto parking spaces + 199 bike parking spaces) and associated site work as per plans. (foundation / superstructure permit: 100979631) (occupancy group: r-2 / type 1a construction) consultant reviewer: globetrotters engineering
$19MOct 5, 2026315 S Jefferson StNew Constructiondds 2019 cbc: new construction of a 9-story mixed use building with basement on caissons. the 1st floor will consist of residential lobby, 21 mechanized parking spaces, office, and retail tenant space with 52 residential units on the above floors. (occupancy: r-2, m; construction type: 1b) consultant reviewer: globetrotters engineering
$17MDec 22, 202555 E Washington StPermit – Express Permit Programtuckpointing and unit masonry repair / replacement: 12000 sq. ft., lintel qty. 90, max. length 10. parapet rebuilding: 200 sq. ft. location: all exterior elevations of the building.
$16MDec 23, 20258 N Morgan StNew Constructiondds 2019 cbc: full building permit for a three-story bath house (occupancy groups: b, a-2, a-3, s-1, s-2; type iia construction). consultant reviewer: v3 companies of il
$15.5MApr 10, 20261220 W Van Buren StRenovation/Alterationdds 2019 cbc: renovation and 1-story addition to existing 7-story building to create an 8-story multi-family residential development with 112 units, fitness center, landscaped courtyard, and 24 indoor basement parking spaces. work includes historic facade restoration (occupancy groups r-2, s-2, type ib construction). consultant reviewer: v3 companies of il