Fifty alderpeople, fifty slices of the city. Search by name or neighborhood, shade the map by what you care about, and open any ward for its full dashboard — or look up your address to find yours.
Live from the Chicago Data Portal (crimes, 311, building permits, business licenses, traffic crashes, ward offices), refreshed hourly. Ranks compare all 50 wards; 1st is the highest value, which isn’t always the worst. Crashes, Divvy docks and affordable units are assigned to wards by their coordinates. Last-month bars are hatched because the month isn’t over.
Ward 1 — Daniel La Spata · dashboard · chicago.fyi
Alderperson, 1st Ward
Daniel La Spata
1958 North Milwaukee Avenue, 60647
City Hall: 121 North Lasalle Street, Room 300, Office 13
$38MApr 9, 20261628 W Division StNew Constructiondds cbc 2019 full building permit for 13-story building with 121 dwelling units and first floor garage.. sprinkler system under seperate permit. (occupancy group r-2; type 1a construction) consultant reviewer: v3 companies of il
$12MMar 23, 20262938 W Fullerton AveRenovation/Alterationdds 2019 cbrc: renovation of an existing 5-story storage building to convert to residential (62 dwelling units) with ground floor retail & 5-story addition, at-grade parking (7 parking spaces) and associated site work as per plans.(occupancy group: m, r-2 / type iiia construction) consultant reviewer globetrotters engineering
$11.5MMay 13, 20262705 W Prindiville StNew Constructiondirect developer services 2019 cbc erect 7 story residential building with 45 standard dwelling units and 5 efficiency units with ground floor retail space and 11 interior vehicle parking spaces caissons under separate permit 101079046 (con type 1b fs occ r2 m s2) consultant reviewer: v3 companies of il
Crimes by month, 25 months
353Sep 2026· ▼ 4% vs Sep 2025· average ward 393
476
Oct 2024Ward 1Average wardOct 2026
Most reported, 2026 · vs 2025
Theft98832%▼ 13%
Burglary43514%▲ 100%
Battery36612%▲ 8%
Motor Vehicle Theft34411%▲ 41%
Criminal Damage34011%▲ 16%
Deceptive Practice2037%▼ 18%
Assault1525%▼ 13%
When incidents happen · last 12 months
Busiest: Sun 12a–1a · 55 incidents · 1.4% of the year
$7.2MDec 18, 20251239 N Wood StRenovation/Alterationdds 2019 cbc: interior and exterior alterations to existing 4 story masonry building with a 4-story addition-total 26 dwelling units (r-2, iiia) as per plans. consultant reviewer: v3 companies of il
$4.7MApr 7, 20261805 N Campbell AveNew Constructiondds 2019 cbc: full building permit for 4 story 21 d.u. building, rooftop deck, rooftop stair enclosures, elevator over-run, elevator penthouse, 11 car garage at 1st floor, deck at 2nd story over portion of garage, entire building sprinklered as per plan (occupancy group r-2, s-2 type iiia construction) as per plan. consultant reviewer: v3 companies of il
$4MSep 15, 20261817 N California AveNew Constructiondds 2019 cbc: full building permit for 5 story 24 d.u. building, 24 car garage at 1st story, deck at 2nd story over portion of garage, front deck at 2nd thru 5th story, rear balcony at 3rd thru 5th story, front patio at 1st story, rooftop stair enclosure, elevator over-run, 1 exterior loading berth, 24 on-site bicycle parking spaces, 6' high 13' by 3' masonry trash enclosure, entire building sprinklered (occupancy group r-2, s-2, type iiia construction). consultant reviewer: v3 companies of il
$3.5MMay 15, 20262625 N Talman AveRenovation/Alterationspr 2019 cbrc alteration and change of occupancy for existing 2-story + basement church to 3-story + basement multi-family residential building with 16 units and 0 on-site parking spaces (occupancy group r-2; type iii-a construction, sprinklered) new rear basement stair, roof decks and masonry trash enclosure per plans **certified plans corrections: conditional permit subject to field inspections **
$2.8MAug 13, 20262759 W Armitage AveNew Construction2019 cbc - new construction building 2-stories mixed use. main level& partial 2nd level business veterinary clinic, and partial 2nd level r-3 dwelling unit. 2nd level r-3 is sprinklered and separated. r-3 extends to hallway and staircase 1; both are sprinklered. occupiable roof deck on 2nd level slab on grade, cmu and brick masonry all work as per plans**certified corrections subject to field inspections & audit **